The DIMKAT company recently undertook and completed the Photovoltaic (PV) net metering type project on behalf of the company M.I. MAILLIS MONOPROSOPI S.A.E., with a total maximum power of 999.54 kWp, in the Dambasi location of the industrial area of Oinophyton in the Municipality of Tanagra.
In particular, the company undertook design and study services, supplies of the necessary equipment for construction, installation work and delivery in full operation of a photovoltaic energy offset plant on the roofs of the factory.
The project installed 1,851 LR5-72HBD monocrystalline silicon PV panels from LONGI with a power of 540 Wp each. The project is expected to generate 1600000kwh per year. The LONGI company is one of the largest and most innovative companies manufacturing PV panels.
The inverters used are from the Huawei company, which ranks among the first companies in Inverter sales with certified partners in Greece with immediate response to technical support.
The mounting system of the PV panels on the industrial roof that was used came from the EUROPA company. The specific base is made of high durability aluminum alloy offering robustness and resistance over time.
Our company proceeded with a design and analytical study for the selection of the electrical equipment to minimize the losses and at the same time ensured the provision of the best economic and technical solution respecting all the national and international standards of requirements for electrical installations.
The design of the project was done with the respect for the environment as a criterion, observing the National legislations regarding the protection measures and the rules that apply specifically in the project area and working at height. The workers followed all the instructions and personal protection measures, received training at the start of the project on the requirements it presents and a safety technician with similar experience was put in charge.
Our company provides a guarantee of good execution of the photovoltaic plant in accordance with the Technical Specifications of the Project. The collaboration between the companies was impeccable ensuring the success of the good execution.